← All California ADU Regulations
Los Angeles CountyLos Angeles Region

West Hollywood ADU Regulations

West Hollywood's ADU rules in WHMC §19.36.310.E include explicit minimum size (150 sq ft) and clear thresholds for when an ADU Permit is required versus a building permit only.

Official West Hollywood ADU Page →Design Your ADU
Population
35,000
Permit Shot Clock
60 business days
Plus 15-day completeness review
Pre-Approved Plans
Yes — saves time & cost
ADU Programs
2 city programs listed
See program list below

What Makes West Hollywood Different

  • Explicit matrix for when an ADU Permit is required vs building permit only
  • No off-street parking required and no replacement parking
  • JADUs need recorded deed restriction before Certificate of Occupancy
  • Rooftop decks banned on ADUs per published standards

Size & Building Constraints

WHMC §19.36.310.E: min 150 sq ft. Max 850 sq ft (studio/1BR) or 1,200 sq ft (2+ BR) for ADUs needing an ADU Permit. R1 FAR total ≤0.5 when ADU Permit triggered. Detached height 18 ft, attached 25 ft.

State guarantee: California requires every city to allow at least an 800 sq ft ADU exempt from local lot coverage, FAR, and front-setback rules.

Height baseline: 16 ft for detached, rising to 18 ft within ½ mile of major transit. Attached ADUs follow the primary home, capped at 25 ft.

Sketching an ADU for West Hollywood? Draft a floorplan and walk through it in 3D — no sign-up required.
Open Design Tool →

Parking

City table: off-street parking not required. Replacement of removed spaces not required (subject to project specifics).

Permitting Process

Many compliant ADUs get building-permit-only review within the 60-day ministerial clock. Non-conforming projects need an ADU Permit (also ministerial).

State backstop: A complete ADU permit must receive a decision in 60 business days. If the city stalls past 30 business days, AB 253 lets you hire a certified private plan checker to force a 10-business-day decision.

Fees & Cost Programs

FAQ on the same page states no local impact fees for ADUs.

SB 543: No impact fees on ADUs ≤750 sq ft. Above 750 sq ft, fees scale to the ratio of ADU size vs the main home.

West Hollywood ADU Programs

Pre-Approved ADU Plan Program
Affordable ADU Pilot Program

Visit the official West Hollywood ADU page (link in hero) for current eligibility and downloads.

Owner Occupancy & JADUs

Standard ADUs in West Hollywood: no owner-occupancy required (made permanent in 2023).

JADUs: limited to 500 sq ft of interior livable space within an existing single-family home. Owner occupancy is required only when sanitation facilities are shared with the main house. JADUs cannot be used as short-term rentals (AB 1154 / SB 543).

Design an ADU that fits West Hollywood’s rules

Sketch a floorplan, walk through it in 3D, and have our planners review it for size, height, and setback compliance before you submit to West Hollywood.

Start Designing — FreeRequest Plan ReviewExplore FinancingCheck Local Rents

Other cities in Los Angeles Region

Los Angeles
Los Angeles County
Long Beach
Los Angeles County
Pasadena
Los Angeles County
Glendale
Los Angeles County
Burbank
Los Angeles County
Santa Monica
Los Angeles County

Heads up: Local rules change frequently. This page summarizes publicly available state law (California Government Code §§ 66310–66342) and current local guidance for general planning purposes. Always confirm specifics with the West Hollywood planning desk before submitting plans. ADUMetrics does not provide legal advice.