← All California ADU Regulations
San Diego County

San Diego ADU Regulations

The City of San Diego is one of the most ADU-friendly jurisdictions in California, layering its own Bonus ADU pathway on top of every state allowance. Companion units are widely accepted, and the city actively recognizes pre-approved plans from neighboring jurisdictions.

Official San Diego ADU Page →Design Your ADU
Population
1,390,000
Permit Shot Clock
60 business days
Plus 15-day completeness review
Pre-Approved Plans
Verify with city
ADU Programs
4 city programs listed
See program list below

What Makes San Diego Different

  • ADU Bonus Program: build deed-restricted affordable ADUs to unlock additional capacity beyond state limits
  • Accessible Bonus ADU pathway when two affordable ADUs are provided
  • Accepts pre-approved plans from County of San Diego, Chula Vista, and Encinitas PRADU
  • ADU condominiums and separate sale supported via Chapter 12 subdivision process
  • San Diego Housing Commission ADU Finance Program (loans + free technical assistance)

Size & Building Constraints

ADUs from 150 sq ft up to 1,200 sq ft. JADUs 150–500 sq ft. The Bonus ADU Program adds capacity beyond state baseline.

State guarantee: California requires every city to allow at least an 800 sq ft ADU exempt from local lot coverage, FAR, and front-setback rules.

Height baseline: 16 ft for detached, rising to 18 ft within ½ mile of major transit. Attached ADUs follow the primary home, capped at 25 ft.

Sketching an ADU for San Diego? Draft a floorplan and walk through it in 3D — no sign-up required.
Open Design Tool →

Parking

No parking required for most ADUs. Garage conversions in the Beach Impact Area outside a Transit Priority Area need one replacement space unless an exception applies (≤500 sq ft, historic district, attached, residential parking district, or near car-share).

Permitting Process

Permits are issued through the Development Services Department (DSD) using a Building/Combination Building Permit. Coastal Overlay parcels follow a separate Coastal ADU path. The city pledges a 30-day review for applications using a pre-approved plan.

State backstop: A complete ADU permit must receive a decision in 60 business days. If the city stalls past 30 business days, AB 253 lets you hire a certified private plan checker to force a 10-business-day decision.

Fees & Cost Programs

ADUs are subject to the Inclusionary Housing Regulations. Fees scale with size per SB 543. The San Diego Housing Commission ADU Finance Program offers construction loans and technical assistance.

SB 543: No impact fees on ADUs ≤750 sq ft. Above 750 sq ft, fees scale to the ratio of ADU size vs the main home.

San Diego ADU Programs

ADU Bonus Program
Accessible Bonus ADU
SDHC ADU Finance Program
Companion Unit Handbook

Visit the official San Diego ADU page (link in hero) for current eligibility and downloads.

Owner Occupancy & JADUs

Standard ADUs in San Diego: no owner-occupancy required (made permanent in 2023).

JADUs: limited to 500 sq ft of interior livable space within an existing single-family home. Owner occupancy is required only when sanitation facilities are shared with the main house. JADUs cannot be used as short-term rentals (AB 1154 / SB 543).

Design an ADU that fits San Diego’s rules

Sketch a floorplan, walk through it in 3D, and have our planners review it for size, height, and setback compliance before you submit to San Diego.

Start Designing — FreeRequest Plan ReviewExplore FinancingCheck Local Rents

Other cities in San Diego County

County of San Diego (Unincorporated)
San Diego County
Carlsbad
San Diego County
Chula Vista
San Diego County
Coronado
San Diego County
Del Mar
San Diego County
El Cajon
San Diego County

Heads up: Local rules change frequently. This page summarizes publicly available state law (California Government Code §§ 66310–66342) and current local guidance for general planning purposes. Always confirm specifics with the San Diego planning desk before submitting plans. ADUMetrics does not provide legal advice.